HT & LT panel installation — safe, certified, reliable.
We design, supply and install high-tension and low-tension distribution panels for factories, housing societies and infrastructure projects. Every installation is tested, certified and built to code.
Designed right. Installed safe. Built to last.
Panel installation is safety-critical. Our certified electricians ensure every connection meets code and every panel is tested before energising.
Every panel type, every application.
High-tension (HT) panels
11KV incoming panels, metering panels and protection panels. Designed for utility connection and industrial power distribution with proper relay protection.
Low-tension (LT) panels
Distribution boards, motor control centres (MCC), power factor correction panels and change-over panels for residential, commercial and industrial applications.
Panel upgrades & retrofits
Upgrading outdated panels to modern standards — improved safety, better load management and compliance with current electrical codes.
Testing & commissioning
Complete panel testing — insulation resistance, earth continuity, phase sequence and protection relay testing before energisation.
From design to energised.
We handle the complete lifecycle — load assessment, panel design, installation and commissioning.
-
01
Day 0
Load assessment
We assess your power requirements, distribution layout and protection needs to specify the right panel configuration.
-
02
3–5 days
Panel design & supply
Custom panel design based on your requirements. Panels sourced or fabricated to specification.
-
03
1–2 weeks
Installation
On-site installation by certified electricians. All wiring, bus-bar connections and earthing completed to code.
-
04
Same day
Testing & handover
Full electrical testing, protection verification and system commissioning. Documentation and user training provided.
Questions about panel installation.
Common questions about HT and LT panel services. Call us for anything else.
What is the difference between HT and LT panels?
HT (high-tension) panels handle high-voltage power (typically 11KV) coming from the utility grid. LT (low-tension) panels distribute the stepped-down power (typically 400V) to your equipment and circuits. Most installations need both.
Do you design custom panel layouts?
Yes. Every panel installation is designed to match your specific load distribution, protection requirements and site layout. We don't use generic off-the-shelf configurations for industrial or large commercial projects.
How long does panel installation take?
A typical panel installation takes 1–2 weeks from design approval to commissioning. Simple distribution board installations can be completed in 2–3 days.
Can you upgrade our existing panels?
Yes. We retrofit and upgrade outdated panels to meet current safety standards, improve load management and add capacity for future expansion. We assess your existing setup and recommend the most cost-effective upgrade path.
Need panels installed? Get a certified team on-site.
Load assessment, custom design and installation — fully certified.