SVC-05 / Panels

HT & LT panel installation — safe, certified, reliable.

We design, supply and install high-tension and low-tension distribution panels for factories, housing societies and infrastructure projects. Every installation is tested, certified and built to code.

HT & LT PANELS CERTIFIED ON-SITE INSTALL ALL SECTORS
TransfoLine HT and LT electrical panel installation for industrial and commercial projects in Pakistan
Panel types
HT & LT
Certified
IEC Standards
Installation
On-site
01
  Why Our Panel Solutions

Designed right. Installed safe. Built to last.

Panel installation is safety-critical. Our certified electricians ensure every connection meets code and every panel is tested before energising.

B.01 Certified installation Every panel installation meets IEC standards and local electrical board requirements. Fully inspected and tested before handover. IEC Certified
B.02 Custom panel design We design panel layouts to match your specific load distribution, protection requirements and future expansion plans — not one-size-fits-all. Custom Design
B.03 HT and LT expertise From 11KV high-tension incoming panels to low-tension distribution boards — we handle both sides of the transformer. Full Range
B.04 Integrated with transformers As a transformer supplier, we coordinate panel installation with transformer commissioning — one team, one timeline, no gaps between systems. Integrated
02
  What We Install

Every panel type, every application.

01

High-tension (HT) panels

11KV incoming panels, metering panels and protection panels. Designed for utility connection and industrial power distribution with proper relay protection.

02

Low-tension (LT) panels

Distribution boards, motor control centres (MCC), power factor correction panels and change-over panels for residential, commercial and industrial applications.

03

Panel upgrades & retrofits

Upgrading outdated panels to modern standards — improved safety, better load management and compliance with current electrical codes.

04

Testing & commissioning

Complete panel testing — insulation resistance, earth continuity, phase sequence and protection relay testing before energisation.

03
  Procedure

From design to energised.

We handle the complete lifecycle — load assessment, panel design, installation and commissioning.

  1. 01 Day 0

    Load assessment

    We assess your power requirements, distribution layout and protection needs to specify the right panel configuration.

  2. 02 3–5 days

    Panel design & supply

    Custom panel design based on your requirements. Panels sourced or fabricated to specification.

  3. 03 1–2 weeks

    Installation

    On-site installation by certified electricians. All wiring, bus-bar connections and earthing completed to code.

  4. 04 Same day

    Testing & handover

    Full electrical testing, protection verification and system commissioning. Documentation and user training provided.

04   Answers

Questions about panel installation.

Common questions about HT and LT panel services. Call us for anything else.

What is the difference between HT and LT panels?

HT (high-tension) panels handle high-voltage power (typically 11KV) coming from the utility grid. LT (low-tension) panels distribute the stepped-down power (typically 400V) to your equipment and circuits. Most installations need both.

Do you design custom panel layouts?

Yes. Every panel installation is designed to match your specific load distribution, protection requirements and site layout. We don't use generic off-the-shelf configurations for industrial or large commercial projects.

How long does panel installation take?

A typical panel installation takes 1–2 weeks from design approval to commissioning. Simple distribution board installations can be completed in 2–3 days.

Can you upgrade our existing panels?

Yes. We retrofit and upgrade outdated panels to meet current safety standards, improve load management and add capacity for future expansion. We assess your existing setup and recommend the most cost-effective upgrade path.

Need panels installed? Get a certified team on-site.

Load assessment, custom design and installation — fully certified.