Town & society electrification — concept to completion.
We deliver complete electrification infrastructure for towns, housing societies and residential developments. From transformers and panels to wiring and grid connection — one contractor, one timeline, one point of accountability.
One contractor. One timeline. Zero gaps.
Electrification projects fail when too many contractors are involved. We handle everything under one roof — no coordination headaches.
Complete power infrastructure.
Transformer supply & installation
We supply and install the right transformers for the project — sized to the load, delivered from our own stock, commissioned on-site by our engineers.
HT & LT panel installation
High-tension and low-tension distribution panels installed, tested and connected to the grid. Safe, certified and built to last.
Distribution wiring & poles
Complete aerial and underground wiring, pole installation and distribution network — designed for the development layout and future expansion.
Grid connection & commissioning
We coordinate with WAPDA/DISCO for grid connection, handle all paperwork and commission the full system before handover.
From site survey to switch-on.
We manage the entire project lifecycle. Most society electrification projects are completed within 4–8 weeks.
-
01
Week 1
Site survey & design
Our engineers survey the site, calculate load requirements and design the distribution layout tailored to the development.
-
02
Week 1–2
Approvals & procurement
We handle WAPDA/DISCO approvals while sourcing transformers, panels and materials from our own stock and trusted suppliers.
-
03
Week 2–6
Installation
Transformers, panels, poles and wiring installed by our own crews. Regular progress updates at every stage.
-
04
Week 6–8
Commissioning & handover
Full system testing, grid connection and handover. We provide documentation, training and ongoing support.
Questions about electrification projects.
Common questions about town and society electrification. Call us for anything else.
What does a turnkey electrification project include?
Everything needed to bring power to your development — transformers, HT/LT panels, distribution wiring, poles, metering and grid connection. We handle design, procurement, installation, approvals and commissioning.
How long does a society electrification project take?
Most projects are completed within 4–8 weeks depending on the size of the development and regulatory approvals. We provide a detailed timeline during the planning phase.
Do you handle WAPDA/DISCO approvals?
Yes. We manage all regulatory paperwork, inspections and approvals required for grid connection. You don't need to coordinate with the utility company separately.
What areas do you serve for electrification projects?
We serve all major cities in Pakistan including Lahore, Islamabad, Karachi, Faisalabad and Peshawar. Contact us for projects in other locations — we assess availability on a case-by-case basis.
Planning an electrification project? Let's talk scope.
Site survey, design and full project quote — no obligation.